Tags: atlantic right whales, august 4, biopsy, calves, department of energy, electricity delivery, electronic mail, energy independence, federal register, independence avenue, kv, nmfs, north atlantic right whales, powerlink, right whale, right whales, san diego county california, san diego gas electric, swpl, transmission line,
Pages: 3
Language: english
Created: Sat Aug 2 00:20:53 2008
Display cached document
Page 1
image
Page 2
image
Page 3
image
                                         45218                         Federal Register / Vol. 73, No. 150 / Monday, August 4, 2008 / Notices

                                         calves three to six months of age may                   constructed by San Diego Gas & Electric               ADDRESSES:   Written comments or
                                         also be biopsy sampled. The original                    Company (SDG&E) adjacent to the                       suggestions on the scope of the EA
                                         application submitted by the WCNE                       existing Southwest Powerlink (SWPL)                   should be addressed to: Mrs. Ellen
                                         included a request to conduct research                  500­kV transmission line, located in                  Russell, Office of Electricity Delivery
                                         on North Atlantic right whales                          San Diego County, California. Baja Wind               and Energy Reliability (OE­20), U.S.
                                         (Eubalaena glacialis). At the time of                   has applied to DOE's Office of                        Department of Energy, 1000
                                         permit issuance, takes for right whales                 Electricity Delivery and Energy                       Independence Avenue, SW.,
                                         were not authorized. NMFS is now                        Reliability (OE) for a Presidential permit            Washington, DC 20585­0350; phone
                                         reviewing the right whale portion of the                to construct either a double-circuit 230-             202­586­9624, facsimile at 202­586­
                                         request as an amendment to Permit No.                   kilovolt (kV) or a single-circuit 500-kV              8008, or electronic mail at
                                         605­1904. The WCNE requests                             electric transmission line across the U.S.            Ellen.Russell@hq.doe.gov.
                                         authorization to harass up to 75 North                  border with Mexico.
                                         Atlantic right whales annually during                      The EA, entitled Baja Wind U.S.                    FOR FURTHER INFORMATION:     For further
                                         close vessel approaches for photo-                      Transmission Environmental                            information on the proposed project, on
                                         identification, behavioral observation,                 Assessment (DOE/EA­399) will address                  the Presidential permit process, or to
                                         and prey sampling. This work would                      potential environmental impacts from                  receive a copy of the pre-approval EA
                                         continue long-term population                           the proposed action and the range of                  when it is issued for state and public
                                         monitoring to determine status and                      reasonable alternatives. The EA will be               review, contact Ellen Russell at the
                                         trends of this species in the North                     prepared in compliance with the                       address listed in the ADDRESSES section
                                         Atlantic. The amendment would be                        National Environmental Policy Act of                  of this notice. The Baja Wind
                                         valid until the permit expires on                       1969 (NEPA) and applicable regulations,               Presidential permit application,
                                         February 15, 2013.                                      including Council on Environmental                    including associated maps and
                                            Concurrent with the publication of                   Quality NEPA Implementing                             drawings, can be downloaded in its
                                         this notice in the Federal Register,                    Regulations (40 CFR parts 1500­1508)                  entirety from the OE program Web site
                                         NMFS is forwarding copies of this                       and DOE NEPA implementing                             http://www.oe.energy.gov/permits.htm.
                                         application to the Marine Mammal                        regulations at 10 CFR Part 1021. It will                For general information on the DOE
                                         Commission and its Committee of                         help DOE determinie whether to                        NEPA process, please contact: Carol M.
                                         Scientific Advisors.                                    prepare an EIS. Given that the proposed               Borgstrom, Director, Office of NEPA
                                           Dated: July 29, 2008.                                 transmission line is short, and that the              Policy and Compliance (GC­20), U.S.
                                         P. Michael Payne,                                       imports into the U.S. appear to be small,             Department of Energy, 1000
                                                                                                 DOE believes an EA is appropriate.                    Independence Avenue, SW.,
                                         Chief, Permits, Conservation and Education
                                         Division, Office of Protected Resources,                   DOE invites the public to participate              Washington, DC 20585­0103; phone
                                         National Marine Fisheries Service.                      in determining the scope of the EA by                 202­586­4600, leave a message at 800­
                                         [FR Doc. E8­17813 Filed 8­1­08; 8:45 am]                suggesting alternatives and pointing out              472­2756, or facsimile to 202­586­
                                                                                                 potential environmental impacts. If at                7031.
                                         BILLING CODE 3510­22­S
                                                                                                 any time during preparation of the EA
                                                                                                 DOE determines that an environmental                  SUPPLEMENTARY INFORMATION:      Executive
                                                                                                 impact statement (EIS) is needed, DOE                 Order (EO) 10485, as amended by EO
                                         DEPARTMENT OF ENERGY                                    will issue a Notice of Intent to prepare              12038, requires that a Presidential
                                         [OE Docket No. PP­334]                                  an EIS in the Federal Register. In that               permit be issued by DOE before electric
                                                                                                 case, this scoping process will serve as              transmission facilities may be
                                         Notice of Intent To Prepare an                          the scoping process that normally                     constructed, operated, maintained, or
                                         Environmental Assessment and To                         would follow a Notice of Intent to                    connected at the U.S. international
                                         Conduct Public Scoping Meetings;                        prepare an EIS. Accordingly, DOE will                 border. The EO provides that a
                                         Baja Wind U.S. Transmission, LLC                        consider any comments on the scope of                 Presidential permit may be issued after
                                         AGENCY: Office of Electricity Delivery                  the EA received during this scoping                   a finding that the proposed project is
                                         and Energy Reliability, DOE.                            process in preparing such an EIS.                     consistent with the public interest and
                                         ACTION: Notice of Intent To Prepare an                  DATES: DOE invites interested agencies,               after favorable recommendations from
                                         Environmental Assessment (EA) and To                    organizations, Native American tribes,                the U.S. Departments of State and
                                         Conduct Public Scoping Meetings.                        and members of the public to submit                   Defense. In determining consistency
                                                                                                 comments or suggestions to assist in                  with the public interest, DOE considers
                                         SUMMARY: The Department of Energy                       identifying any potentially significant               the environmental impacts of the
                                         (DOE) will prepare an EA and hold                       environmental issues and in                           proposed project under NEPA,
                                         public scoping meetings on the                          determining the scope of the EA. The                  determines the project's impact on
                                         proposed Federal action of granting a                   public scoping period starts with the                 electric reliability (including whether
                                         Presidential permit to Baja Wind U.S.                   publication of this Notice in the Federal             the proposed project would adversely
                                         Transmission, LLC (Baja Wind) to                        Register and will continue until                      affect the operation of the U.S. electric
                                         construct a new electric transmission                   September 3, 2008. DOE will consider                  power supply system under normal and
                                         line at the U.S.-Mexico border in San                   all comments received or postmarked by                contingency conditions), and considers
                                         Diego County, California, near the                      September 3, 2008 in defining the scope               any other factors that DOE may find
                                         community of Jacumba. The proposed                      of the EA. Comments received or                       relevant to the public interest. The
                                         international transmission line would                   postmarked after that date will be                    regulations implementing the EO have
                                         originate at a wind generation facility to              considered to the extent practicable.                 been codified at 10 CFR 205.320­
pwalker on PROD1PC71 with NOTICES




                                         be located in northern Baja California,                    Public scoping meetings will be held               205.329. DOE's issuance of a
                                         Mexico, cross the U.S.-Mexico                           on August 26, 2008, from 1 p.m. to 3                  Presidential permit indicates that there
                                         international border, and extend one                    p.m., and again from 5 p.m. to 7 p.m.,                is no Federal objection to the project,
                                         mile into the U.S. where it would                       at the Jacumba Highland Center, 44681                 but does not mandate that the project be
                                         terminate at a substation to be                         Old Highway 80, Jacumba, California.                  undertaken.


                                    VerDate Aug2005   16:50 Aug 01, 2008   Jkt 214001   PO 00000   Frm 00014   Fmt 4703   Sfmt 4703   E:\FR\FM\04AUN1.SGM   04AUN1
                                                                       Federal Register / Vol. 73, No. 150 / Monday, August 4, 2008 / Notices                                           45219

                                         Agency Purpose and Need, Proposed                          Baja Wind's proposed transmission                  Wind Presidential permit application
                                         Action, and Alternatives                                line would connect to a new substation                and soliciting public comments.
                                                                                                 to be constructed by SDG&E in response                Comments received on that notice
                                            The purpose and need for DOE's                       to requests by power suppliers to                     identified potential environmental
                                         action is to decide whether to grant Baja               connect to the SWPL. The proposed                     impacts that may be associated with this
                                         Wind's application for a Presidential                   substation would be located just south                proposed project, for example, impacts
                                         permit for the proposed international                   of the SWPL right-of-way and would                    on threatened or endangered species,
                                         electric transmission line. DOE's                       contain equipment for accepting                       critical habitat, and migratory birds.
                                         proposed action is to issue a                           interconnections at both the 230-kV and                  Several commenters in this
                                         Presidential permit for the construction,               the 500-kV level. The 230-kV                          proceeding have asked DOE to evaluate
                                         operation, maintenance, and connection                  connection equipment would be located                 the impacts associated with activities
                                         of the proposed international electric                  just to the west of the 500-kV                        that will occur inside Mexico (e.g., from
                                         transmission line. If granted, the                      connection equipment, both within the                 the construction and operation in
                                         Presidential permit would authorize                     confines of the substation boundary.                  Mexico of the wind generators). NEPA
                                         only the one-mile portion of the                        Accordingly, Baja Wind has identified                 does not require an analysis of
                                         applicant's proposal that would be                      two routing/voltage alternatives to                   environmental impacts that occur
                                         constructed and operated wholly within                  coincide with interconnection at 230-kV               within another sovereign nation that
                                         the United States.                                      or the 500kV level.                                   result from approved actions by that
                                            Both of Baja Wind's alternatives                                                                           sovereign nation. The EA will evaluate
                                         would cross the U.S.-Mexican border at                  Identification of Environmental Issues                all relevant environmental impacts
                                         the same location. However, the                            In the EA, DOE will examine public                 within the U.S. related to the proposed
                                         alternative identified as A1 in the                     health and safety effects and                         action.
                                         Presidential permit application would                   environmental impacts in the United                   Scoping Process
                                         be constructed at 500-kV and would be                   States from the proposed transmission
                                         the eastern alternative; the alternative                facilities and from the wind farm to the                 Interested parties are invited to
                                         identified as A2 would be constructed at                extent that any impacts from it occur                 participate in the scoping process both
                                         230-kV and be located to the west of the                within the United States. DOE invites                 to refine the environmental issues to be
                                                                                                 Tribal governments, Federal, State and                analyzed and to identify the reasonable
                                         A1 alternative. Both alternatives would
                                                                                                 local agencies, and those entities with               range of alternatives. Both oral and
                                         be located wholly within private
                                                                                                 jurisdiction by law or special expertise              written comments will be considered
                                         property in eastern San Diego County
                                                                                                 with respect to environmental issues to               and given equal weight by DOE.
                                         near the unincorporated community of                                                                             Public scoping meetings will be held
                                         Jacumba. In addition to the alternatives                be cooperating agencies in the
                                                                                                                                                       at the location, date, and times
                                         proposed by Baja Wind, DOE will                         preparation of the EA, as defined at 40
                                                                                                                                                       indicated above under the DATES
                                         consider reasonable alternatives that are               CFR 1501.6.
                                                                                                    This notice is to inform the public of             section. The scoping meetings will
                                         identified during scoping. The EA will                                                                        provide interested parties the
                                         also consider the environmental impacts                 the proposed project and to solicit
                                                                                                 comments and suggestions for                          opportunity to view proposed project
                                         of a ``No Action'' alternative.                                                                               exhibits, ask questions, and comment on
                                            Baja Wind's proposed transmission                    consideration in the preparation of the
                                                                                                                                                       the EA scope. The DOE presiding officer
                                         line would connect wind turbines (the                   EA. To help the public frame its
                                                                                                                                                       will establish only those procedures
                                         La Rumorosa Project) to be located in                   comments, this notice contains a
                                                                                                                                                       needed to ensure that everyone who
                                         the vicinity of La Rumorosa, Baja                       preliminary list of potential
                                                                                                                                                       wishes to speak has a chance to do so
                                         California, Mexico, to San Diego Gas &                  environmental issues that DOE has
                                                                                                                                                       and that DOE understands all issues and
                                         Electric's existing Southwest Powerlink                 tentatively identified for analysis. These
                                                                                                                                                       comments. Speakers will be allocated
                                         transmission line. The proposed                         issues include:
                                                                                                    1. Impacts on protected, threatened,               approximately 10 minutes for their oral
                                         transmission line would consist of                                                                            statements. Persons who have not
                                                                                                 endangered, or sensitive species of
                                         either a double-circuit 230-kV or a                                                                           submitted a request to speak in advance
                                                                                                 animals or plants, or their critical
                                         single-circuit 500-kV transmission line                                                                       may register to speak at the scoping
                                                                                                 habitats, e.g., the quino checkerspot
                                         installed on either lattice towers or steel                                                                   meetings, but advance requests are
                                                                                                 butterfly and migratory birds;
                                         monopoles. The La Rumorosa Project                                                                            encouraged. Should any speaker desire
                                                                                                    2. Impacts on cultural or historic
                                         and the two-mile portion of                                                                                   to provide further information that
                                                                                                 resources;
                                         transmission facilities located in Mexico                  3. Impacts on human health and                     cannot be presented within the
                                         would be constructed, owned, operated,                  safety;                                               designated time, such additional
                                         and maintained by a subsidiary of                          4. Impacts on air, soil, and water;                information may be submitted in
                                         Sempra Energy Mexico and would be                          5. Visual impacts;                                 writing by the date listed in the DATES
                                         subject to the permitting requirements                     6. Socioeconomic impacts;                          section. Both oral and written comments
                                         of the Mexican Government. The                             7. Disproportionately high and                     will be considered and given equal
                                         proposed one-mile long transmission                     adverse impacts on minority and low-                  weight by DOE.
                                         line within the United States would be                  income populations;                                      The pre-approval EA is planned to be
                                         on private land and constructed, owned,                    8. Impacts that would accrue to the                issued for state and public review by the
                                         operated, and maintained by Baja Wind.                  U.S. as a result of related activities                spring of 2009. Persons submitting
                                         The entire electrical output of the La                  occurring inside Mexico (e.g., dust from              comments during the scoping process
                                         Rumorosa Project (1250 megawatts,                       the construction process inside Mexico                will receive a copy. Persons who do not
                                         approximately 260 to 300 turbines)                      or location of wind generators within                 wish to submit comments or suggestions
pwalker on PROD1PC71 with NOTICES




                                         would be dedicated to the U.S. market                   view of the U.S.); and                                at this time but who would like to
                                         and delivered using the proposed                           9. Cumulative impacts.                             receive a copy of the document for
                                         international transmission line. The EA                    On February 22, 2008, DOE published                review when it is issued should notify
                                         will only consider impacts that occur                   a notice in the Federal Register (73 FR               Ellen Russell at the address provided
                                         inside the United States.                               9782) announcing receipt of the Baja                  above.


                                    VerDate Aug2005   16:50 Aug 01, 2008   Jkt 214001   PO 00000   Frm 00015   Fmt 4703   Sfmt 4703   E:\FR\FM\04AUN1.SGM   04AUN1
                                         45220                         Federal Register / Vol. 73, No. 150 / Monday, August 4, 2008 / Notices

                                           Issued in Washington, DC, on July 30,                 are on file at the following location:                mail the OMB control number of the
                                         2008.                                                   Environmental Protection Agency,                      collection or, if there is no OMB control
                                         Kevin M. Kolevar,                                       Region 6, Water Quality Protection                    number, the Title shown in the
                                         Assistant Secretary, Office of Electricity              Division, Source Water Protection                     SUPPLEMENTARY INFORMATION section
                                         Delivery and Energy Reliability.                        Branch (6WQ­S), 1445 Ross Avenue,                     below. If you are unable to submit your
                                         [FR Doc. E8­17840 Filed 8­1­08; 8:45 am]                Dallas, Texas 75202­2733.                             comments by e-mail contact the person
                                         BILLING CODE 6450­01­P                                  FOR FURTHER INFORMATION CONTACT:                      listed below to make alternate
                                                                                                 Philip Dellinger, Chief Ground Water/                 arrangements.
                                                                                                 UIC Section, EPA--Region 6, telephone
                                                                                                 (214) 665­7150.                                       FOR FURTHER INFORMATION CONTACT:     For
                                         ENVIRONMENTAL PROTECTION                                                                                      additional information about the
                                         AGENCY                                                    Dated: July 28, 2008.                               information collection(s) or to obtain a
                                         [FRL­8700­5]                                            Miguel I. Flores,                                     copy of the collection send an e-mail to
                                                                                                 Division Director, Water Quality Protection           PRA@fcc.gov and include the
                                         Underground Injection Control                           Division.                                             collection's OMB control number as
                                         Program; Hazardous Waste Injection                      [FR Doc. E8­17815 Filed 8­1­08; 8:45 am]              shown in the SUPPLEMENTARY
                                         Restrictions; Petition for Exemption--                  BILLING CODE 6560­50­P                                INFORMATION section below (or the title
                                         Class I Hazardous Waste Injection;                                                                            of the collection if there is no OMB
                                         Solutia, Inc.                                                                                                 control number), or call Jerry Cowden at
                                         AGENCY: Environmental Protection                        FEDERAL COMMUNICATIONS                                202­418­0447.
                                         Agency (EPA).                                           COMMISSION                                            SUPPLEMENTARY INFORMATION:
                                         ACTION: Notice of Final Decisions on No                 Notice of Public Information                             OMB Control Number: 3060­0204.
                                         Migration Petition Reissuances.                         Collection(s) Being Reviewed by the                      Title: Special Eligibility Showings for
                                                                                                 Federal Communications Commission,                    Authorizations in the Public Safety Pool
                                         SUMMARY: Notice is hereby given that
                                                                                                 Comments Requested                                    (47 CFR 90.20(a)(2)(v) and
                                         exemptions to the land disposal
                                         restrictions under the 1984 Hazardous                   July 29, 2008.
                                                                                                                                                       90.20(a)(2)(xi)).
                                         and Solid Waste Amendments to the                       SUMMARY: As part of its continuing effort                Form Number: Not applicable.
                                         Resource Conservation and Recovery                      to reduce paperwork burden and as                        Type of Review: Revision of a
                                         Act have been granted to Solutia, Inc,                  required by the Paperwork Reduction                   currently approved collection.
                                         Chocolate Bayou Facility (Solutia) for                  Act (PRA) of 1995 (44 U.S.C. 3501­                       Respondents: Individuals and
                                         two Class I injection wells located at                  3520), the Federal Communications                     businesses.
                                         Alvin, Texas. As required by 40 CFR                     Commission invites the general public
                                         Part 148, the company has adequately                                                                             Number of Respondents and
                                                                                                 and other Federal agencies to comment
                                         demonstrated to the satisfaction of the                                                                       Responses: 220 respondents; 220
                                                                                                 on the following information
                                         Environmental Protection Agency by the                                                                        responses.
                                                                                                 collection(s). Comments are requested
                                         petitions and supporting documentation                  concerning (a) whether the proposed                      Estimated Time per Response: 0.686
                                         that, to a reasonable degree of certainty,              collection of information is necessary                hour (range of 3 minutes to 45 minutes).
                                         there will be no migration of hazardous                 for the proper performance of the                        Frequency of Response: One-time
                                         constituents from the injection zone for                functions of the Commission, including                reporting requirement.
                                         as long as the waste remains hazardous.                 whether the information shall have                       Obligation to Respond: Required to
                                         These final decisions allow the                         practical utility; (b) the accuracy of the            obtain or retain benefits.
                                         underground injection by Solutia, of the                Commission's burden estimate; (c) ways                   Total Annual Burden: 151 hours.
                                         specific restricted hazardous wastes                    to enhance the quality, utility, and
                                         identified in these exemptions, into                    clarity of the information collected; and                Total Annual Cost: None.
                                         Class I hazardous waste injection wells                 (d) ways to minimize the burden of the                   Privacy Act Impact Assessment: The
                                         Nos. WDW­224 and WDW­326 at the                         collection of information on the                      information collection in 47 CFR
                                         Chocolate Bayou, Alvin, Texas facility,                 respondents, including the use of                     90.20(a)(2)(v) affects individuals, and
                                         until December 31, 2026, unless EPA                     automated collection techniques or                    there is a system of records that covers
                                         moves to terminate these exemptions                     other forms of information technology.                it (FCC/WTB­1, Wireless Services
                                         under provisions of 40 CFR 148.24.                      An agency may not conduct or sponsor                  Licensing Records).
                                         Additional conditions included in these                 a collection of information unless it                    Nature and Extent of Confidentiality:
                                         final decisions may be reviewed by                      displays a currently valid OMB control                Requests to withhold information
                                         contacting the Region 6 Ground Water/                   number. No person shall be subject to                 submitted to the Commission from
                                         UIC Section. As required by 40 CFR                      any penalty for failing to comply with                public inspection will be treated in
                                         148.22(b) and 124.10, a public notice                   a collection of information subject to the            accordance with section 0.459 of the
                                         was issued June 5, 2008. The public                     Paperwork Reduction Act that does not                 Commission's rules.
                                         comment period closed on July 21,                       display a valid OMB control number.                      Needs and Uses: The Commission
                                         2008. No comments were received.                        DATES: Written PRA comments should                    collects this information to ensure that
                                         These decisions constitute final Agency                 be submitted on or before October 3,                  certain non-governmental applicants
                                         action and there is no Administrative                   2008. If you anticipate that you will be              applying for the use of frequencies in
                                         appeal. These decisions may be                          submitting comments, but find it                      the Public Safety Pool meet the
                                         reviewed/appealed in compliance with                    difficult to do so within the period of               eligibility criteria set forth in the
pwalker on PROD1PC71 with NOTICES




                                         the Administrative Procedure Act.                       time allowed by this notice, you should               Commission's rules. The collection is
                                         DATES: These actions are effective as of                advise the contact listed below as soon               being revised to consolidate under one
                                         July 28, 2008.                                          as possible.                                          OMB control number two information
                                         ADDRESSES: Copies of the petitions and                  ADDRESSES: Submit your comments by                    collections that were previously under
                                         all pertinent information relating thereto              e-mail to PRA@fcc.gov. Include in the e-              separate OMB control numbers.


                                    VerDate Aug2005   16:50 Aug 01, 2008   Jkt 214001   PO 00000   Frm 00016   Fmt 4703   Sfmt 4703   E:\FR\FM\04AUN1.SGM   04AUN1