Case Study: Power Scottish Power St Asaphs 132kV Substation and OHL works.
Initial Situation
Background The design of the new substation
St Asaphs substation is a major was created in partnership with
Renewable energy is taking substation in the North Wales area, Scottish Power. Throughout the
an increasingly important however it needed its twelve bay, construction and testing phases
position on the agendas of insulated building demolishing and of the new infrastructure a
energy companies. rebuilding, as well as a connection transparent and detailed project
building to the Kinmel Bay wind plan was followed and was
farm. available to all involved.
Scottish Power is no
different. Its wind farm in This required the complete The final phases, which are due
Kinmel bay, just off the coast redesign, construction and testing to take place in the summer of
of North Wales, needed to be of the new infrastructure, the 2008, are the demolition of the
linked to main land diversion of overhead lines and old substation building and the
substations and power lines. connections creating to the wind construction of the final two
farm. bays.
Enterprise Power has been
working closely with Scottish Key Customer Requirement
Power on this project to
ensure that the power Scottish Power wanted a one-stop-
generated by the wind farm shop approach to this project to
enable the project to run more
is directed safely and
efficiently and timely.
efficiently into the national
grid for use by local residents Enterprise Power has been working
and businesses. on large scale substation rebuilding
and OHL diversion projects for over
18 years and therefore had all the
necessary experience and
expertise.
Our Response
Our turnkey service allows us to Summary
manage all design, (Electrical &
Civil), construction, electrical This flagship project for Scottish
construction, testing and Power is a demonstration of our
commissioning of equipment and capability as a complete turnkey
infrastructure for the substation. supplier.
The overhead line diversion and The services that Enterprise
reconnection work of the 132KV Power were able to provide has
lines to the Kinmel Bay windfarm made the project run effectively,
was one of the major undertakings. efficiently, on time and with cost
Enterprise Power Services
Metropoint
Our in-house capability meant that savings for the customer.
1A Chalk Lane we could design, plan and build
Cockfosters the necessary infrastructure quickly, We look forward to completing
Herts ensuring that this phase did not this exciting project and
EN4 9JQ delay the project. undertaking more such work for
Scottish Power.
Tel: +44 (0)208 370 0800 Other work included the diversion
Fax: +44 (0)208 370 0888 of smaller, lower voltage cabling
www.enterprise.plc.uk works.